Diesel Place banner
1 - 1 of 1 Posts

·
Registered
Joined
·
62 Posts
Mine always takes 10 plus a splash to put it to the full mark. I pull the front of the truck onto ramps, leave the rear down, open the fumoto, and let her drain.
 
1 - 1 of 1 Posts
This is an older thread, you may not receive a response, and could be reviving an old thread. Please consider creating a new thread.
Top